Government

Renovate B400 EOD, Topside Point Loma Base

Renovate B400 EOD, Topside Point Loma Base

Point Loma, CA 5,000 sq ft Tenant Improvement/Remodel of 5,000+ square feet building for NAVFAC Point Loma. This project required civil work like fencing, fire alarm coordination, HVAC and electrical upgrades; as well as finishes. It included a good portion of design...

CBP Otay Mesa Sail

CBP Otay Mesa Sail

Otay, CA Creative Builds provided a “shade sail” type canopy over the vehicle lift at the vehicle secondary lanes at the Otay Mesa Land Port of Entry (LPOE).

Building 5 Army Corps at Seal Beach

Building 5 Army Corps at Seal Beach

Seal Beach, CA6,500 sqftLED Lighting Retrofit Replacement for Building 5 for Army Corps, energy efficiency remodel. This project required a Design-Build approach by creating a Photovoltaic study and design that allowed to optimize energy savings. The project site was...